Setting the system shunt – GE Industrial Solutions Galaxy Power Systems User Manual

Page 198

Advertising
background image

Installation Guide for Galaxy Power Systems

15 - 14 Power Up and Installation Completion

Issue 12 August 2012

Setting the System Shunt

Setting the System Shunt

Step

Action

1

Enter the appropriate key sequence:

• Millennium Controller:


Main

Config Plant Shunt Type Enter

• Vector Controller:

Main

Configuration Shunts Type

2

Select Shunt Type:

• Distributed Architecture no shunts external to the GPS

cabinet), select:

– “None” for Millennium Controller

– “BAT” for Vector Controller.

• Centralized Architecture (shunts outside the GPS cabinet

used), select:

– “Load” for either Millennium or Vector Controller

3

Set the shunt size for centralized architecture systems (the
size is factory-set for distributed architecture systems).

• Millennium Controller:


Menu

Config Plant Shunt mV use <+> and

<-> keys to scroll through available values

Enter

Menu

Config Plant Shunt I use <+> and

<-> keys to scroll through available values

Enter

• Vector Controller:


Main

Configuration Shunts Shunt 1 Rated

Advertising