Setting the system shunt – GE Industrial Solutions Galaxy Power Systems User Manual
Page 198
Installation Guide for Galaxy Power Systems
15 - 14 Power Up and Installation Completion
Issue 12 August 2012
Setting the System Shunt
Setting the System Shunt
Step
Action
1
Enter the appropriate key sequence:
• Millennium Controller:
Main
Config Plant Shunt Type Enter
• Vector Controller:
Main
Configuration Shunts Type
2
Select Shunt Type:
• Distributed Architecture no shunts external to the GPS
cabinet), select:
– “None” for Millennium Controller
– “BAT” for Vector Controller.
• Centralized Architecture (shunts outside the GPS cabinet
used), select:
– “Load” for either Millennium or Vector Controller
3
Set the shunt size for centralized architecture systems (the
size is factory-set for distributed architecture systems).
• Millennium Controller:
Menu
Config Plant Shunt mV use <+> and
<-> keys to scroll through available values
Enter
Menu
Config Plant Shunt I use <+> and
<-> keys to scroll through available values
Enter
• Vector Controller:
Main
Configuration Shunts Shunt 1 Rated