Getting started, Tools and hardware, 3 getting started – GE Industrial Solutions Galaxy Power Systems User Manual

Page 37: 3getting started

Advertising
background image

Installation Guide for Galaxy Power Systems

Issue 12 August 2012

Getting Started 3 - 1

3

Getting Started

Tools and
Hardware

You will need the following tools and hardware to install the Galaxy
Power System:

• Material-handling equipment to unload the cabinet at the installation

site, remove from shipping container, and set in final position
[minimum lifting capacity: 900 lbs. (410Kg)] Note: Use the
equipment weights and dimensions as a guideline for choosing
material-handling equipment.

• Drill and drill bits to install floor anchors

• 3/16-inch (5mm) Allen-head wrench (provided)

Insulated hand tools

• Screw drivers (flat-blade and Phillips)

• Wire cutters and stripper

• Torque wrenches (see Table 3-A)

35-513 in·lbs (4-58 N·m)

• Sockets:

Metric

English Equivalent Hardware

8mm

5/16"

M5

10mm

--

M6

13mm

1/2"

M8

17mm

11/16"

M10

19mm

3/4"

M12

--

3/8"

1/4"

--

9/16"

3/8"

Advertising