15 - 6 Power Up and Installation Completion

Issue 12 August 2012

Initial Power Up of the System, continued

Initial Power Up of the System, continued

Step

Action

c. Place the rectifier on the appropriate shelf assembly. Note:

Install rectifiers vertically, starting at the bottom left side of the
shelf assembly and working up and left to right (if applicable).

d. Carefully slide the rectifier toward the rear of the shelf

assembly. Push until the unit is seated.

e. Gently pushing against the right side of the rectifier, use a

5mm (3/16-inch) Allen-head wrench (T-handle) to turn the
recessed locking screw clockwise to secure the rectifier to the
shelf.


Note: It is extremely important to fully seat the rectifier into its
shelf position. A steady or blinking ALM LED on the rectifier,
after it has been seated and turned on, must be investigated and
resolved before it is allowed to support a load.

Install Converter

Cards

3

Install converter cards. The cards “click” into place inside the
carrier. See Figure 15-3.


Note: Converters are optional equipment.

4

Turn ON the control switch on the converters, if equipped.

5

Turn ON the ac source circuit breaker and the ac circuit breaker
for the installed rectifier.

6

Turn ON the rectifier’s power switch; close its output breaker, if
equipped.

7

Verify that the converters, if equipped, and rectifier turn ON.

Verify Controller

8

Verify that the controller and the optional contactor control
boards power up.


Note: Red LEDs will light on BJN and LVBD cards.

9

If the controller has alpha-character capability, verify that the text
on the display is in English. If Spanish text is required, follow
instructions on the Help menu to make the change.

10

If the BSJ intelligent board is present in the Millennium
controller, activate its memory backup battery by moving jumper
P206 (located just to the battery’s right) to its Enable position.