GE Industrial Solutions Galaxy Power Systems User Manual

Page 14

Advertising
background image

Installation Guide for Galaxy Power Systems

4 - List of Figures

Issue 12 August 2012

Figure 8-1: Installation of Large Circuit Breakers

and Capacitor Charge Unit

8-3

Figure 8-2: ED83143-31 Group 1 DC Distribution Panel

8-5

Figure 8-3: ED83143-31 Group 2 DC Distribution Panel

8-6

Figure 8-4: ED83143-31 Group 5 DC Distribution Panel

8-7

Figure 8-5: ED83143-31 Group 11 DC Distribution Panel

8-8

Figure 8-6: ED83143-31 Group 12 DC Distribution Panel

8-9

Figure 8-7: ED83143-31 Group 15 DC Distribution Panel

8-10

Figure 8-8: ED83143-31 Group 16 (14 position) and

Group 17 (22 position) DC Distribution Panels

8-11

Figure 8-9: ED83143-31 Group 21 DC Distribution Panel

8-12

Figure 8-10: ED83143-31 Group 22 DC Distribution Panel

8-13

Figure 8-11: ED83143-31 Group 53 DC Distribution Panel

8-14

Figure 8-12: ED83143-31 Group 54 (5 position) DC Distribution Panel

8-15

Figure 8-13: ED83143-31 Group 55 DC Distribution Panel

8-16

Figure 8-14: ED83143-31 Group 56 DC Distribution Panel

8-17

Figure 8-15: ED83143-31 Group 58 (6 positionGMT) DC Distribution

Panel

8-18

Figure 8-16: ED83143-31 Groups 71 and 171

DC Distribution Panel

8-19

Figure 8-17: EBV Circuit Pack for Load Disconnect

8-20

Figure 9-1: Converter Position

9-3

Figure 9-2: Installing a Second Carrier

9-3

Figure 9-3: Setting the CIC ID Switch

9-4

Figure 9-4: Converter Connection for System Ground

9-6

Figure 9-5: Connection Point for System Ground Wire

9-7

Figure 9-6: Installation of Load Circuit Breakers into 597A

Converter Carrier

9-8

Figure 10-1: Possible RPM Mounting Locations

10-2

Advertising