Battery and alarm fuses and circuit breakers – GE Industrial Solutions Galaxy Power Systems User Manual

Page 163

Advertising
background image

Installation Guide for Galaxy Power Systems

Issue 12 August 2012

Battery Connection Panels 11 - 11

Battery and Alarm Fuses and Circuit Breakers

If the battery connection panel is equipped with battery fuses and alarm
fuses, do not install them at this time; the battery fuses should be
installed after batteries have been connected.

If the battery connection panel is equipped with circuit breakers, they
should be installed but left in the OFF position.

Note: The batteries will be connected in Section 15, Power Up and
Installation Completion
.

Advertising