Procedure, Procedure 5-15, Cabinet installation, continued – GE Industrial Solutions Galaxy Power Systems User Manual

Page 61

Advertising
background image

Installation Guide for Galaxy Power Systems

Issue 12 August 2012

Cabinet Floor Mounting and Battery Stand Connection 5 - 15

Cabinet Installation, continued

Procedure

Refer to Figure 5-12 for this procedure.

Cabinet Installation

Step

Action

1

Position the appropriate drill template where the cabinet is
to be located.

Comcode of

Template

For:

847891280

GPS4812/24, GPS2424/30, or GPS4848/100

846898708

2VR375 Battery Stand

846736841

2VR250 Battery Stand

847733342

12IR125LP Battery Stand

2

Using a drill bit, drill anchor holes to the depths specified in
Table 5-B.

3

Locate the cabinet in position using two or four anchor
bolts and hold-down washers.

4

Shim under cabinet corners to level.

5

Torque anchors as specified in Table 5-B.

6

Secure cabinets together using the hardware provided.

Note: See H569-407 for more details.

Advertising