Installation Guide for Galaxy Power Systems

15 - 4 Power Up and Installation Completion

Issue 12 August 2012

Initial Power Up of the System

Initial Power Up of the System

Step

Action

1

To turn up the system while using the factory default firmware and
software loaded in the controller, proceed as follows:

Warning

Before proceeding with the initial power up of the system,
verify:

Batteries are disconnected from the system bus.

The ac source circuit breakers are turned OFF.

The system ac and dc load circuit breakers/fuses are OFF or
removed.

Rectifier

Installation

Notes

Install rectifiers from bottom to top of cabinets. Vacant rectifier
position below or beside the top installed rectifier in a cabinet may
cause over-heating of the installed rectifiers. Install a Rectifier Shelf
Cover / Air Dam into vacant positions.

Install Rectifier Shelf Cover / Air Dam on rectifier shelves as
required. See Figure 15-4.

When installing a single 595LTA or 595LTB on a shelf, install an
Air Dam to block vacant right or left rectifier position.

Rectifier Shelf Cover Covers both left and right rectifier positions

(848680211)

Air Dam

Covers the left or right rectifier position

(848754358)

Continued on next page.