GE Industrial Solutions Galaxy Power Systems User Manual

Page 15

Advertising
background image

Installation Guide for Galaxy Power Systems

Issue 12 August 2012

List of Figures - 5

Figure 10-2: Connection of Voltage, Shunt, Transducer,

and Binary Modules

10-5

Figure 10-3: Connection of Temperature Module

10-6

Figure 10-4: Connection of Control Relay Module

10-7

Figure 10-5: Connection to the Controller (All Modules)

10-8

Figure 10-6: RPM Module Assembly

10-9

Figure 11-1: Additional Battery Leads

11-3

Figure 11-2: H569-434 Battery Connection Panel Options

11-4

Figure 11-3: H569-436 Battery Connection Panel Options

11-5

Figure 11-4: H569-437 Battery Connection Panel Options

11-6

Figure 11-5: BJN Low Voltage Battery Disconnect

Contactor Control Board (Full-Height Cabinet)

11-9

Figure 11-6: BJN Low Voltage Battery Disconnect

Contactor Control Board (Half-Height Cabinet)

11-10

Figure 12-1: Thermal Probe Cable Assembly Connection

to Millennium Controller

12-3

Figure 12-2: Thermal Probe Cable Assembly Connection

to Vector Controller

12-4

Figure 12-3: Wiring Schematic for Extender Cable

12-5

Figure 12-4: Thermal Probe and 210E Cable Routing

12-5

Figure 12-5: Thermal Probe Connection to BLJ Board

12-6

Figure 12-6: Thermal Probe Connection to Millennium

Controller

12-7

Figure 12-7: 210E Connection to Vector Controller or BLJ

12-9

Figure 12-8: 210E Connection to the Millennium Controller

12-10

Figure 12-9: Cable Assembly Connection to 210E

12-11

Figure 12-10: Cable Assembly Connection to Thermal Probes 12-12

Figure 12-11: Monitoring a 210E Alarm off the BLJ-BIC7/8 in a

Millennium System

12-13

Figure 13-1: Fascia Cover Installation

13-2

Advertising