Installation Guide for Galaxy Power Systems
Issue 12 August 2012
Remote Peripheral Monitoring 10 - 5
RPM Installation, continued
Figure 10-2: Connection of Voltage, Shunt, Transducer,
and Binary Modules
Cable Tie
100K
100K
Source
CLR Assembly
(847540424)
Generic Monitoring Connection
100K Thermistor
(407209808) or any of the
100K Ring Type Probes
and Connecting Cable
Shown in Figure 10-3.
Two Wire and
Shield Output
(If not the
last Module)
Two Wire and
Shield Input
X2
OUT
OUT
Place Bus Terminating
Resistor (405298308)
on Last Module in the
Chain for Each Bus
X1
TB102
IN
SHIELD
SHIELD
IN
+
Mounting Holes
CH6
EXT TEMP
-
-
+
+
CH5
-
CH4
+
-
CH3
-
-
+
CH2
TB101
CH1
+
Note: CLRs are not required for
any GPS load panel connections.
Typical GPS Load Monitoring Shunt Connection