Vector controller, To vector controller, Connecting thermal probe cable assembly, continued – GE Industrial Solutions Galaxy Power Systems User Manual
Page 168
Advertising
Installation Guide for Galaxy Power Systems
12 - 4 Thermal Probe and 210E Connections
Issue 12 August 2012
Connecting Thermal Probe Cable Assembly, continued
Vector Controller
Connect probes according to one of the options shown in Figure 12-2.
Note: Refer to Table 12-A for alpha designations in Figure 12-2.
Figure 12-2: Thermal Probe Cable Assembly Connection
to Vector Controller
Advertising