Lamp test – GE Industrial Solutions Galaxy Power Systems User Manual

Page 195

Advertising
background image

Installation Guide for Galaxy Power Systems

Issue 12 August 2012

Power Up and Installation Completion 15 - 11

Lamp Test

Lamp Test

Step

Action

1

Depress LAMP TEST on the Millennium controller display
or follow menu path Home -> Control -> Start Lamp Test on
the Vector controller.

2

Verify that the LEDs on the rectifiers, converters, and
controller illuminate.

Note: The green NORMAL LEDs will remain illuminated
on the rectifiers, converters (optional), controller, LVBD and
LVLD contactor control boards (optional), and the remote
peripheral monitoring modules (optional). The other
controller LEDs will extinguish after several seconds, and
the remaining system LEDs will extinguish within
approximately 10 seconds.

Advertising