Lamp test – GE Industrial Solutions Galaxy Power Systems User Manual
Page 195
Advertising
Installation Guide for Galaxy Power Systems
Issue 12 August 2012
Power Up and Installation Completion 15 - 11
Lamp Test
Lamp Test
Step
Action
1
Depress LAMP TEST on the Millennium controller display
or follow menu path Home -> Control -> Start Lamp Test on
the Vector controller.
2
Verify that the LEDs on the rectifiers, converters, and
controller illuminate.
Note: The green NORMAL LEDs will remain illuminated
on the rectifiers, converters (optional), controller, LVBD and
LVLD contactor control boards (optional), and the remote
peripheral monitoring modules (optional). The other
controller LEDs will extinguish after several seconds, and
the remaining system LEDs will extinguish within
approximately 10 seconds.
Advertising