Power Up and Installation Completion 15 - 1

15

Power Up and Installation
Completion

Initial System Checkout and Preparation for Power Up

Before Installing

Converters and

Rectifiers

Prior to installing converters (if equipped) and rectifiers, verify that the
correct ac voltage is present at the ac connectors in the rectifier shelves.
Note: Disregard if this was done as part of the “AC Connection and
Wiring” procedure.

Safety Reminder

Some of the following procedures are performed while ac voltage is
present at the cabinet; exercise extreme caution and observe all
precautions described in the safety section of this product manual.

Controller Front Panels

Illustrations

Refer to the following figures for illustrations of the controller front
panels:

Figures 15-1a and 15-1b Millennium Controller
Figures 15-2a and 15-2b Vector Controller