Installation Guide for Galaxy Power Systems

3 - 4 Getting Started

Issue 12 August 2012

Unpacking

Before opening the packaging, carefully inspect the outside in the
presence of shipping personnel for signs of damage. Carefully open the
packaging to verify that the contents are complete and undamaged. If
damaged, follow the shipping carrier’s procedure for filing a damage
claim. If the equipment must be returned, it should be repacked in the
original shipping crate.

Location

Before continuing, verify that the following conditions exist at the
installation site:

• Floor is conditioned and clean (refers to removal of any combustible

flooring, e.g., carpet, wood, etc.).

• Batteries and associated stands are in place.

• Cable rack not supported by cabinets is in place.

• Job Site Documentation is available that details cabinet locations, dc

distribution assignments, and Remote Peripheral Monitoring System
module location and assignment.