Tools and hardware, continued – GE Industrial Solutions Galaxy Power Systems User Manual
Page 38
Advertising
Installation Guide for Galaxy Power Systems
3 - 2 Getting Started
Issue 12 August 2012
Tools and Hardware, continued
• Crimp tools
– 22-16 gauge
– 10-500 MCM (5-120mm
2
)
• Jeweler’s screwdriver
• Digital multimeter (DMM) with 0.05% accuracy on dc scale
• Load box (100 amperes @ 24V)
• Load box (200 amperes @ 48V)
• Laptop or personal computer (PC) loaded with Windows 3.1 or later
(optional)
• ESD wrist strap*
*Equipment is ESD sensitive. It is required that an ESD wrist strap
be worn during installation and repair. An ESD wrist strap
(408157105) is provided with each controller.
Advertising