Initial power up of the system, continued – GE Industrial Solutions Galaxy Power Systems User Manual
Page 192
Advertising
Installation Guide for Galaxy Power Systems
15 - 8 Power Up and Installation Completion
Issue 12 August 2012
Initial Power Up of the System, continued
14
Follow Step 2 to install the remaining rectifiers, and follow Step
13 to set their ID numbers.
15
Verify that the system voltage again reads 26.04 volts (or 52.08
volts).
Advertising