Initial power up of the system, continued – GE Industrial Solutions Galaxy Power Systems User Manual

Page 192

Advertising
background image

Installation Guide for Galaxy Power Systems

15 - 8 Power Up and Installation Completion

Issue 12 August 2012

Initial Power Up of the System, continued

14

Follow Step 2 to install the remaining rectifiers, and follow Step
13 to set their ID numbers.

15

Verify that the system voltage again reads 26.04 volts (or 52.08
volts).

Advertising