13 fascia cover installation, 14 connection of office alarms, 15 power up and installation completion – GE Industrial Solutions Galaxy Power Systems User Manual

Page 8

Advertising
background image

Installation Guide for Galaxy Power Systems

4 - Table of Contents

Issue 12 August 2012

Connecting Cable Assembly to Thermal Probes

12-12

Monitoring a 210E Alarm Signal, BLJ-BIC7/8 with Millennium 12-13

13 Fascia Cover Installation

Introduction 13-1
Installing the Fascia Covers

13-2

14 Connection of Office Alarms

Introduction 14-1
Connecting Controller Alarms

14-1

15 Power Up and Installation Completion

Initial System Checkout and Preparation for Power Up

15-1

Controller Front Panels

15-1

Millennium 15-2
Vector 15-3

Initial Power Up of the System

15-4

Rectifier Installation Notes

15-4

Install First Rectifier

15-5

Install Converter Cards

15-6

Verify Controller

15-6

Set Rectifier ID

15-7

Installing Rectifiers and Converters

15-9

Lamp Test

15-11

Voltage Calibration

15-12

Setting the System Float Voltage

15-13

Setting the System Shunt

15-14

Setting the Low-Voltage Battery Disconnect Feature

15-15

Setting the Low-Voltage Load Disconnect Feature

15-17

Connecting Batteries

15-19

Testing Rectifiers and Load Share

15-21

Testing Temperature Compensation (Optional Feature)

15-22

Testing Additional Alarms

15-23

Testing the BD Alarm and High Voltage Shutdown

15-24

Galaxy Millennium Controller System Alarm Test

15-25

Connecting to Load

15-25

16 Addition or Modification to a Galaxy Power

System

Upgrading a GPS4848 System to a GPS4848/100 System

16-1

Adding an ED83143-31 Distribution Panel to a GPS

16-2

Installing an LVLD Contactor (if required)

16-5

Adding a Cabinet to an Existing GPS System with

Distributed Architecture.

16-6