background image

9--3

Powerware 9330 (10 kVA--40 kVA) Installation and Operation

164201300 REV. G 061502

9.4 Starting the Power Processing Unit

To start the Power Processing Unit (PPU) without transferring the critical load to

normal, perform the following procedure:

1.

Ensure the UPS circuit breakers and switches are set as follows:

UPS Input Breaker (CB1)

OPEN

UPS Battery Breaker (CB2)

OPEN

UPS Maintenance Bypass Switch

UPS

Options Cabinet Maintenance Bypass Switch (if installed)

UPS

2.

Close the UPS input feeder circuit breaker.

3.

If UPS is dual feed, close UPS Bypass input feeder circuit breaker.

4.

If Options cabinet is installed, close Options cabinet Input, Bypass, and Output

circuit breakers.

5.

Observe UPS monitor screen becoming active as an indication of logic power.

6.

Press the System Control pushbutton. The System Control screen appears.

7.

On the System Control screen, the PPU status should indicate SHUTDOWN,

after approximately 20 seconds

8.

On the UPS, close Input breaker CB1.

9.

On the UPS, close Battery breaker CB2.

10.

If installed, close the Battery breakers on Battery cabinets.

11.

Select

PPU ON from the System Control menu.

PPU ON Mode Requested appears on the screen.

The critical load is immediately supplied by the bypass source, in Bypass mode. The

status indicator on the UPS Control Panel indicates the UPS is in Bypass mode.

12.

Observe the following messages appear sequentially on the PPU status line:

WAITING FOR INPUT

DC STARTING

INVERTER STARTING

SYNCING

READY

The rectifier and inverter turn on. When the inverter reaches full voltage,the UPS is

ready to transfer to the Normal mode and supply the critical load.

13.

The UPS is now operating in the Bypass mode and the

BYPASS status

indicator is illuminated.