2.2.4

Installing

Optional Remote Battery Power Wiring to the

Powerware 9330 (25 kVA---40 kVA) UPS

If installing a remote battery system, perform the following procedure:

CAUTION:

When sizing battery system, do not exceed internal battery charger capabilities.

Refer to Chapter 15

“Specifications”, for maximum battery charger currents.

1.

If not already removed, remove left front solid panel, and front vented panels

from the Powerware 9330 (25 kVA---40 kVA) UPS cabinet . Front panels are

secured with magnetic latches and are removed by pulling panels straight

forward to disengage magnetic latches (see Figure 2---3).

NOTE: Remove UPS cabinet input, output, and remote battery input conduit landing

plate to punch conduit holes.

2.

Route battery cables to UPS remote battery terminal block. Refer to Appendix

A of this manual for wiring access information.

3.

Connect positive, negative, and ground DC power wiring from external battery

source to the DC input and ground terminals in the UPS cabinet. Refer to

Appendix A of this manual for wiring and termination requirements and wiring

access information.

4.

If permanently mounting the system, proceed to step 7; otherwise, proceed to

step 5.

5.

Secure the UPS cabinet in position by lowering the leveling feet, until cabinet is

not resting on the casters and the cabinet is level.

6.

If installing Battery and Options cabinets, repeat steps 1 through 10 in

paragraph 2.2.2 for Battery and Options cabinets and proceed to paragraphs

2.3 and 2.4; otherwise, proceed to paragraph 2.2.5.

7.

Using retained hardware, reinstall shipping brackets previously removed to

front and rear of UPS cabinet with the angle facing outward.(see Figures 2---3

and 2---4).

8.

If installing Battery and Options cabinets, repeat steps 1 through 10 in

paragraph 2.2.2 for Battery and Options cabinets and proceed to paragraphs

2.3 and 2.4; otherwise, proceed to step 9.

9.

Secure cabinet to floor with contractor supplied hardware and proceed to

paragraph 2.2.5.