1.1.5 Inspecting and Unpacking Each Cabinet

The first task in preparing for installation is inspecting and unpacking the UPS

sections. The UPS and accessory cabinets are shipped bolted to wooden pallets,

as shown in Figures 1---1 or 1---2, and protected with outer protective packaging

material.

Figure 1---1. Powerware 9330 (10 kVA---20 kVA) UPS Cabinet as Shipped on Pallet