Powerware 9330 User Manual

Page 184

Advertising
background image

DESCRIPTION:

DATE:

DRAWING NO:

13 of 17

SHEET:

REVISION: F

111501

POWER WIRING INSTALLATION NOTES

164201300---1

A---14

Powerware 9330 (10 kVA--40 kVA) Installation and Operation

164201300 REV. G 061502

Table S. Power Cable Conduit Requirements Powerware 9330 (20 kVA)

Powerware

System

Voltage

Terminal

Number of

Wires in

Conduit

Minimum

Conduit

Trade Size

(inches)

Number of

Conduits

AC Input to UPS

(A, B, C, Gnd)

4

1

1

9330-20/20

208

AC

AC Input to Bypass

(A, B, C, Neut, Gnd)

5

1

1

AC

Output

(A, B, C, Neut, Gnd)

5

1

1

AC Input to UPS

(A, B, C, Gnd)

4

1/2

1

9330-20/20

480

AC

AC Input to Bypass

(A, B, C, Neut, Gnd)

5

3/4

1

C

Output

(A, B, C, Neut, Gnd)

5

3/4

1

AC Input to UPS

(A, B, C, Gnd)

4

1/2

1

9330-20/20

600

AC

AC Input to Bypass

(A, B, C, Neut, Gnd)

5

1/2

1

C

Output

(A, B, C, Neut, Gnd)

5

1/2

1

9330---20/20

288

DC

External Battery DC Source

(Positive, Negative, Gnd)

3

3/4

1

Advertising