Remove the top side panel mounting screw (tie/grounding bracket location in

Figures 2---9 or 2---11) from both the Option and UPS cabinets.

14.

Secure the back of Options cabinet to the back of the UPS cabinet with the

tie/grounding bracket. Secure the bracket with the side panel mounting

screws.

15.

Proceed to paragraph 2.4.3.

16.

Using retained hardware, reinstall shipping brackets previously removed to

front and rear of Options cabinet with the angle facing outward.(see Figures

2---10 or 2---12).

17.

Secure the front of Options cabinet to the front of the UPS cabinet with the

long flat grounding/mounting bracket from the installation kit (see Figures

2---10). Use hardware provided in the kit to secure the bracket.

18.

Remove the top side panel mounting screw (tie/grounding bracket location in

Figure 2---10 or 2---12) from both the Option and UPS cabinets.

19.

Secure the back of Options cabinet to the back of the UPS cabinet with the

tie/grounding bracket. Secure the bracket with the side panel mounting

screws.

20.

Secure cabinets to floor with contractor supplied hardware.

21.

Proceed to paragraph 2.4.3.