1.1

Installing the UPS

The cabinet sections of the

UPS are shipped on separate pallets. Use a forklift or

pallet jack, rated to handle the weight of the cabinets (refer to Drawing

164201300---3 in Appendix A for cabinet weights), to move the packaged cabinet

sections to the installation site, or as close as possible to the site, before unloading

from the pallet.
This is the basic sequence of the installation steps:

1.

Create an installation plan for the UPS system (Chapter 1).

2.

Prepare your site for the UPS system (Chapter 1).

3.

Inspect, unpack, and unload the UPS cabinet sections (Chapter 1).

4.

Wire the system (Chapter 2).

5.

Install features, accessories, and/or options, as applicable (Chapter 3).

6.

Complete the Installation Checklist (Chapter 2).

7.

Have authorized service personnel perform preliminary operational checks and

startup.

NOTE: Startup and operational checks should be performed only by authorized

service personnel. This service is usually offered as part of the sales

contract for your UPS. Contact service in advance (usually a two week

notice is required) to reserve a preferred startup date.

1.1.1 Creating an Installation Plan

Before beginning to install the UPS system, read and understand how this manual

applies to the system being installed. Use the procedures and illustrations in the

following chapters to create a logical plan for installing the system.

1.1.2 Preparing Your Site

For your UPS system to operate at peak efficiency, your installation site should

meet the environmental parameters outlined in this manual. If you intend to

operate the system at an altitude higher than 1500 meters (5000 feet), contact your

local sales or service office for important information about high altitude operation.

The operating environment must meet the weight, airflow, size and clearance,

requirements specified in Appendix A.