5 pre/post screen deposit page parameters – INFICON Cygnus 2 Thin Film Deposition Controller User Manual
Page 108
5 - 10
IP
N 07
4-
54
5-
P1
E
Cygnus 2 Operating Manual
5.1.5 Pre/Post Screen Deposit Page Parameters
Figure 5-7 Material pre/post page
MATERIAL NUMBER . . . . . . . . . . . 1 to 6
Change the number to edit or create a different Material
NOTE: The first power ramp consisting of Pre-Cond Rise and Pre-Cond Soak is
skipped if the Idle power is nonzero.
PRECON RISE TIME. . . . . . . . . . . . 00:00 to 99:59 min:s
This parameter provides the time period over which the Source power is
ramped from 0 to Pre-Cond Soak Power. The default values is 00:00.
PRECON SOAK POWER . . . . . . . . 0.00 to 99.99%
This parameter is usually set to the power level at which the source material
just begins to glow. The Cygnus 2 ramps the power level from zero to Pre-Cond
Soak Power linearly over the time period Pre-Cond Rise Time. The default
value is 0. If set to a value greater than Maximum Power, Maximum Power has
priority.
PRECON SOAK TIME. . . . . . . . . . . 00:00 to 99:59 min:s
This parameter provides the time period for which the Cygnus 2 holds at
Precon Soak Power. The default value is 00:00.