Metrohm tiamo 1.1 Manual User Manual

Page 148

Advertising
background image

120

Workplace

the set counter then the current statistical data will first be deleted and
the statistics counter reset to

0

.

6 - Main run

When processing the loaded method the following actions can be carried out:

Process main track

After the start of the Main track the status changes to

BUSY

. The com-

mands of the main track and the other tracks that it calls up are proc-
essed in sequence. If the main track calls up tracks that are not free

then a pause will be made until these tracks can be started.

Interrupt and continue run

A running determination can be interrupted at any time with

[Hold]

and

then continued with

[Cont]

. All the active tracks will be stopped and

continued together.

Cancel sequence

A running series can be canceled at any time with

[Stop]

. An Exit track

may be carried out; the determination will be terminated.

Cancel by error

If when a determination is being carried out an error occurs that

causes the cancellation of the determination then an Error track may
be carried out; the determination will be terminated.

Process exit track

When the main track and all the other tracks that it has called up have
been completed then an Exit track may be carried out; the determina-

tion will be terminated. After the end of the Main track the status
changes to

READY

.

7 - Post-conditioning (only for methods with conditioning)

In methods that contain commands with switched-on conditioning and in which
the option

Automatic conditioning

is switched on in the

START

command then for all

these commands post-conditioning will be started automatically with the loaded

method immediately after the end of the track that contains the conditioning
command.

Conditioning requirement not fulfilled

After the start of post-conditioning the status changes to

COND BUSY

.

In this status a new determination can be started with

[Start]

, even

though the conditioning requirement has not been fulfilled. Condition-
ing can also be canceled with

[Stop]

or interrupted with

[Hold]

and

then continued with

[Cont]

. If an error occurs during conditioning then

neither the Error track nor the Exit track will be carried out.

Conditioning requirement fulfilled

If the conditioning requirement has been fulfilled then the status
changes to

COND READY

. In this status a new determination can be

started with

[Start]

. Conditioning can also be canceled with

[Stop]

or

interrupted with

[Hold]

and then continued with

[Cont]

. The condition-

ing requirement will continue to be monitored continuously until the

determination has been started.

Advertising