Metrohm tiamo 1.1 Manual User Manual

Page 757

Advertising
background image

Subwindow Titrants/Solutions

729

Monitoring of GLP validity

on, [ off ]

If this option is switched on then the time interval for the GLP test will be

monitored.

Note
This option can only be switched on when a date has already been entered un-
der

GLP test date

.

GLP test interval

0 ... [ 999 ] days

Time interval up to next GLP test. If an interval is entered then the date for
the

Next GLP test

will be automatically adapted.

Next GLP test

Select date, [GLP test date + 999 days ]

Date on which the next GLP test is to be carried out. This date can be se-
lected by pressing

in the dialog window

Select date

(see General pro-

gram functions - Edit - Select date). When a date has been entered the
value for

GLP test interval

will be automatically adapted.

Action

If the time interval for the GLP test has expired then one of the following actions
will be triggered automatically both at Start test (see Single determinations or De-
termination series) and during the command sequence:

Record message

The message that the GLP test interval has expired will be automatically
saved with the determination.

Display message

A message will appear and you can choose whether to continue the run or
terminate it. If the run is continued then the message that the GLP test in-

terval has expired will be automatically saved with the determination.

Stop determination

The running determination will be automatically terminated. The following
message must be confirmed with

[OK]

.

Advertising