Metrohm tiamo 1.1 Manual User Manual

Page 157

Advertising
background image

Subwindow Run

129

Select method with assignment ID

If the option

Method selection by assignment ID

is switched on the tab

Process

then the

Sample assignment ID

will be used to load the method

defined in the

Sample assignment table

.

3 - Carry out start test

During the Start test the following checks and actions are triggered:

Right to carry out the method?

Checks whether the logged-in user has the right to execute the par-

ticular method.

Method executable?

Checks whether the particular method is executable. If the method is
non-executable then a message appears asking for the method test to
be carried out and the method edited accordingly.

Check device (module) and rack

Checks whether the devices (or device types), modules (e.g. measur-
ing inputs, towers, etc.) and racks demanded in the device-specific
commands are present and available or assigned. If the device has
not yet been assigned in a command then the window

Device assign-

ment

appears for assigning the device.

Check solutions

Checks whether the solutions demanded in the device-specific com-
mands are present and available.

Check sensors

Checks whether the sensors demanded in the device-specific com-

mands are present and available.

Check sample data

Checks whether the entered sample data corresponds to that defined
in method variables and is valid.

Note

The Start test for the number of lines defined under

Autostart

can also be trig-

gered manually in the

READY

status with the menu items

Tools, Run test

or

Sam-

ple table, Run test

.

4 - Preconditioning (only for methods with conditioning)

In methods that contain commands with switched-on conditioning and in which
the option

Automatic conditioning

is switched on in the

START

command then pre-

conditioning will start for all these commands. Preconditioning does not belong to

the determination itself and does not increase any counter (

Sample number

or

Sta-

tistics

).

Conditioning requirement not fulfilled

After the start of preconditioning the status changes to

COND BUSY

. In

this status conditioning can be interrupted with

[Hold]

and continued

with

[Cont]

. If an error occurs during conditioning then neither the Error

track nor the Exit track will be carried out.

Conditioning requirement fulfilled

If the conditioning requirement has been fulfilled the status changes to

COND READY

and the method then starts automatically.

Advertising