Yaskawa Varispeed 626M5 User Manual

Page 90

Advertising
background image

4.4 Sequence Output Signals

4 -15

J

CHWE (Winding Selection Completion Signal)

Connector number: 6CN

Pin numbers:

40

42

D

CHWE signals completion of motor winding selection.

D

The CHWE signal is usually ON when the motor is in operation. When the CHW signal is ON, the

CHWE signal will turn OFF until the winding is switched. The CHWE signal will turn ON again on

completion of the winding selection.

D

If the CHWE signal is not output within a preset time after the CHW signal is input, the AL-20 fault

(winding selection fault) will result and the system will stop the motor.

D

While the winding is selected, the AGR signal will turn OFF if the winding selection is implemented

while the motor is rotating at constant speed.

Winding

High speed

Low speed

[CHW]

[CHWE]

[AGR]

ON

ON

ON

ON

ON

J

ORE (Orientation Completion Signal)

Connector number: 6CN

Pin number:

39

42

D

The ORE signal will turn ON when the ORT signal input turns ON and when the load shaft is close

to the specified stop position.

D

While the ORE signal is ON, the deviation of the position will be compensated with countertorque is

generated to offset external force. Make tool or workpiece changes while the ORE signal is ON.

D

The ORE signal will turn OFF if the external force is high and the deviation of the position is excessive.

In that case, arrange a sequence to result an orientation fault.

J

ORG (Load Shaft Origin) Signal

Connector number: 6CN

Pin numbers:

38

42

D

A single pulse is output per load shaft rotation by using the magnetic sensor signal.

D

The ORG signal will turn ON when the load shaft is rotating at the rate of 1000 min

−1

or less.

4

Advertising
This manual is related to the following products: