GE Industrial Solutions CPS6000-M2 User Manual
Page 38
CPS6000-M2 Installation Guide H5694720
Issue 8 January 2008
38
Step
Action
8
Attach the battery securing top
rail. Secure with provided
(Comcode 901078717) rack
screws
9
Connect the 2 gage cable
between the V- post of the left-
most battery and the input bus
of the disconnect switch.
Torque to battery
manufacturer’s specification.
Is the system equipped with a factory installed QS873 VT thermal probe?
Note: The Millennium II can support up to 16 QS873VT 1-Wire probes. It also
has the capability of directly monitoring up to (4) analog temperature probes.
Temperature measurements are also available through the use of Remote
Peripheral Modules (RPM’s).
No – Proceed to Step 11.
Yes – Proceed to Step 10.
10
Connect the QS873 VT thermal
probe to the inter-cell busbar at
the V- post in the middle of the
battery string.
Cable-tie to front bracket along
with the battery cable.
See “Installing Thermal Probes”
later in this chapter if field
installing Thermal Probes