GE Industrial Solutions CPS6000-M2 User Manual

Page 38

Advertising
background image

CPS6000-M2 Installation Guide H5694720

Issue 8 January 2008

38

Step

Action

8

Attach the battery securing top
rail. Secure with provided
(Comcode 901078717) rack
screws

9

Connect the 2 gage cable
between the V- post of the left-
most battery and the input bus
of the disconnect switch.
Torque to battery
manufacturer’s specification.

Is the system equipped with a factory installed QS873 VT thermal probe?

Note: The Millennium II can support up to 16 QS873VT 1-Wire probes. It also
has the capability of directly monitoring up to (4) analog temperature probes.
Temperature measurements are also available through the use of Remote
Peripheral Modules (RPM’s).

No – Proceed to Step 11.

Yes – Proceed to Step 10.

10

Connect the QS873 VT thermal
probe to the inter-cell busbar at
the V- post in the middle of the
battery string.

Cable-tie to front bracket along
with the battery cable.

See “Installing Thermal Probes”
later in this chapter if field
installing Thermal Probes










Advertising