GE Industrial Solutions CPS6000-M2 User Manual

Page 41

Advertising
background image

CPS6000-M2 Installation Guide H5694720

Issue 8 January 2008

41

Step

Action

4

Secure GMT Module Return bus bars to the distribution panel Return bus bar with
provided (901352617) 1/4-20 nuts.

5

Secure the hinged retainer cover if removed in step 1 above.

Single- and Two-Pole, Breakers and TPS Fuses:

6

Secure Two-Pole adapter busses to the distribution Load and Return busses with
provided (901352617) 1/4-20 nuts.

7

Secure Load and Return Cable connections with provided (901352617) 1/4-20 nuts.
Use 7/16” socket. Torque to 65 in·lbs.

8

Verify (using a voltmeter) polarity of the voltage between the Return bus and the
distribution input bus.

9

Verify wiring polarity at the input of the load equipment.

Leave breaker switches in the OFF position and do not install load fuses until the load
equipment is ready to be energized.

WARNING: Do not install load fuses until the load equipment is ready to be energized.

Three-Pole Breakers:

10

Secure Three-Pole adapter busses to the distribution Load and Return busses with
provided (901352617) 1/4-20 nuts.
Use 7/16” socket. Torque to 65 in·lbs.

11

Secure Load Cable connections with provided hardware (per cable):
(2) 841064777 3/8-16 nut
(2) 801829607 3/8-inch lockwasher
(2) 814251898 3/8-inch flat washer
Use 9/16” socket. Torque to 240 in·lbs.

12

Using a voltmeter, verify polarity of the voltage between the Return bus and the
distribution input bus.

13

Verify wiring polarity at the input of the load equipment.

Leave breaker switches in the OFF position until the load equipment is ready to be
energized.

WARNING: Do not install circuit breakers until the load equipment is ready to be

energized.

GMT Bullet Fuse Modules:

14

Strip load wire 3/8” and secure in the GMT module terminal block.
Use #1 slot screwdriver. Torque to 13 in·lbs.

15

Dress and wire tie with service loop to provide strain relief.

16

Using a voltmeter, verify polarity of the voltage between the RTN and distribution input
bus.

17

Verify wiring polarity at the input of the load equipment.

WARNING: Do not install load fuses until the load equipment is ready to be energized.