Installing QS873 VT Battery Probes

Step

Action

1

Insert the RJ-45 end of the CC848817024 wireset into the P7 1-wire connector on the
controller.

2

Cut the brown voltage sense wire on the CC848817024 at the 3-pin connector.

3

QS873 probe provides 2-pin
and 3-pin receptacles and a 1/4-
inch ring terminal.

Insert the 3-pin connector end
into the receptacle on the
closest VT-Probe.

4

Snap the cover closed on the VT-probe.

5

Place the first probe to the battery post (as in the battery string picture above).

6

Verify the number of probes (1) registered with the controller with command:
MENU →STATUS → BATTERIES → NUM TEMP PROBES.

7

Connect either the 848719803 (5-ft) or the 848719811 (10-ft) cable to the 2-position
receptacle of the first probe and to the 3-position receptacle of another probe.

8

Verify the number of probes (2) registered with the controller with command:
MENU → STATUS → BATTERIES →NUM TEMP PROBES.

9

Repeat Steps 7-8 for each probe until all probes are installed.

10

When all probes are installed, verify they are connected and operating with command:
MENU → STATUS → BATTERIES → NUM TEMP PROBES.

The controller is now set to make thermal measurements in performing slope thermal
compensation. Additional parameters may be set on the controller to customize this feature.