Installing qs-series ringers – GE Industrial Solutions CPS6000-M2 User Manual

Page 46

Advertising
background image

CPS6000-M2 Installation Guide H5694720

Issue 8 January 2008

46

Installing QS-Series Ringers






Step

Action

1

• Up to two Ringer Chassis’s may be installed per rectifier shelf, one in each of the two

right-most power slots. Each Ringer chassis accepts up to two ringer modules, a
primary and a spare.


• For redundant ringing, install both Primary and Spare Ringers in each Ringer Chassis.

WARNING: Consider the Ring signal as hazardous voltage. When
rectifiers and/or battery power is present, all installed QS820M ringer
chassis and QS820A ringer modules will be powered.

• Note: Ringer output connections are made after ringers are seated in the Ringer

chassis.


• Note: The primary and spare Ringer modules install facing opposite directions. No

rectifiers may be installed to the right of a Ringer Chassis. Slots dedicated to Ringers
do not require an ac input circuit in the AC Termination Panel

2

• Slide the ringer chassis into

the power slot.


• Press firmly until the

connector on the rear of the
ringer chassis engages with
the connector at the back of
the power slot on the shelf.


• Verify the hook under the

front left of the ringer chassis
hooks under the shelf.


• Press down on the faceplate

latch and open the faceplate.


• Secure the ringer chassis to

the shelf using one #4 screw,
hand tight to approximately 5
in-lbs.


• Repeat if a second ringer

chassis is required.

Advertising