GE Industrial Solutions CPS6000-M2 User Manual

Page 39

Advertising
background image

CPS6000-M2 Installation Guide H5694720

Issue 8 January 2008

39

Step

Action

11

Connect the factory-wired battery
cable to the V+ post of the right-
most battery. Torque to battery
manufacturer’s specification.

Battery installation is complete.






Attaching Battery Cables to CPS6000-M2 Busses

Action

• Battery Cable landings are as shown. If

required by local code or practice, treat
with an oxidation inhibitor such as
NO-OX.


• Secure Battery Cable connections with

provided hardware (per cable):
(2) 841064777 3/8-16 nut
(2) 801829607 3/8-inch lockwasher
(2) 814251898 3/8-inch flat washer


• Use 9/16” socket. Torque to 240 in·lbs.

Note: Landings are compatible with lugs with

1” hole spacing for 3/8” hardware.

Advertising