GE Industrial Solutions CPS6000-M2 User Manual
Page 39
Advertising
CPS6000-M2 Installation Guide H5694720
Issue 8 January 2008
39
Step
Action
11
Connect the factory-wired battery
cable to the V+ post of the right-
most battery. Torque to battery
manufacturer’s specification.
Battery installation is complete.
Attaching Battery Cables to CPS6000-M2 Busses
Action
• Battery Cable landings are as shown. If
required by local code or practice, treat
with an oxidation inhibitor such as
NO-OX.
• Secure Battery Cable connections with
provided hardware (per cable):
(2) 841064777 3/8-16 nut
(2) 801829607 3/8-inch lockwasher
(2) 814251898 3/8-inch flat washer
• Use 9/16” socket. Torque to 240 in·lbs.
Note: Landings are compatible with lugs with
1” hole spacing for 3/8” hardware.
Advertising