Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 10

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

9

SAS Link and Transport Layer Test Suite v0.13

references in the test description that are not indicated in this manner refer to elements within the
test suite document itself (e.g., “Appendix 5.A”, or “Table 5.1.1-1”)

Resource Requirements

The requirements section specifies the test hardware and/or software needed to perform

the test. This is generally expressed in terms of minimum requirements, however in some cases
specific equipment manufacturer/model information may be provided.

Revision History

This specifies the date of the last modification to this test.


Test Setup

The setup section describes the initial configuration of the test environment. Small

changes in the configuration should not be included here, and are generally covered in the test
procedure section (next).

Procedure

The procedure section of the test description contains the systematic instructions for

carrying out the test. It provides a cookbook approach to testing, and may be interspersed with
observable results.

Observable Results

This section lists the specific observables that can be examined by the tester in order to

verify that the DUT is operating properly. When multiple values for an observable are possible,
this section provides a short discussion on how to interpret them. The determination of a pass or
fail outcome for a particular test is generally based on the successful (or unsuccessful) detection
of a specific observable.

Advertising