Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 72

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

71

SAS Link and Transport Layer Test Suite v0.13

Test 7.2.2 - Connections – 2 SOAF Received

Purpose: To determine that the DUT properly handles received 2 SOAF primitives.

References:

7.2.5.11 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator

Revision History: September 7, 2004

Test Setup: The DUT and the Testing Station are physically connected.


Test Procedure (Initiators):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is an initiator the Testing Station should transmit an Identify Address
frame indicating that it is a target.

• Wait for the DUT to transmit an Open Address frame to the Testing Station. The Testing Station

should transmit OPEN_ACCEPT followed by RRDY. Allow the DUT to transmit a frame and close
the connection.

• The Testing Station should transmit the following to the DUT

o SOAF primitive
o the first 4 dwords of an OpenAddress frame
o complete Open Address frame starting with SOAF.

• Wait for the DUT to transmit OPEN_ACCEPT and RRDY.


Observable Results:

Verify that the DUT responded to the received, complete Open Address frame with OPEN_ACCEPT.



Advertising