SAS Link and Transport Layer Test Suite v0.13

Test 7.4.1 - Closing SSP Connections – DONE (NORMAL)

Purpose: To determine that the DUT properly responds when DONE is received.

References:

7.16.6 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator

Revision History: September 13, 2004

Test Setup: The DUT and the Testing Station are physically connected.


Test Procedure (Targets):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is an initiator.

• The Testing Station should open an SSP connection to the Testing Station.

• Wait for the DUT to transmit OPEN_ACCEPT and RRDY.

• The Testing Station should transmit DONE (NORMAL).


Observable Results: Verify that the DUT transmitted DONE (NORMAL) within 1 msec of receiving DONE
(NORMAL) from the Testing Station.