support for all speeds and SSC settings. The DUT is expected to transmit it's Phy
Capabilities Bits.
Observable Results
●
Verify that following the last ALIGN (1) primitive transmitted during SNW-2 by the
DUT, there is 500.00 µs of D.C. Idle transmitted by the DUT followed by a COMWAKE
signal.
Possible Problems
●
If the DUT does not support 3.0 Gbps signaling, then it will not participate in SNW-2. If
this is the case, an alternative method of timing the first COMWAKE signal during
SNW-3 will have to be found.