SAS Link and Transport Layer Test Suite v0.13
Test 10.1.1 - SCSI CDB – Test Unit Ready
Purpose: To determine that the DUT, an SSP Target port, properly handles a Test Unit Ready command.
References:
SPC-3 6.31
Resource Requirements: SAS Protocol Analyzer and Generator.
Revision History: September 28, 2004
Test Setup: The DUT and the Testing Station are physically connected.
Test Procedure (SSP Target):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is a SAS Initiator.
• The Testing Station should open an SSP connection to the DUT and transmit a SCSI TEST UNIT
READY command to the DUT. Close the connection
• Allow the DUT to open an SSP connection and transmit a SCSI RESPONSE frame to the received
command.
Observable Results: Verify that the DUT transmits RESPONSE frame indicating that the command completed