Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 156
Advertising
University of New Hampshire
InterOperability Laboratory
●
If the DUT employs center-spreading SSC when SSC is enabled, verify that 1.446 µs
after the beginning of the first COMWAKE signal transmitted during SNW-3, a second
COMWAKE signal is transmitted. Otherwise, verify that the DUT transmits at least
1.446 µs of D.C. Idle following the first COMWAKE signal transmitted during SNW-3.
Possible Problems
●
The method of SSC employed by the DUT will have to be determined by a lower level
PHY test.
UNH-IOL
SAS 2.0 Speed Negotiation
20 of 49
Advertising