If the DUT employs center-spreading SSC when SSC is enabled, verify that 1.446 µs
after the beginning of the first COMWAKE signal transmitted during SNW-3, a second
COMWAKE signal is transmitted. Otherwise, verify that the DUT transmits at least
1.446 µs of D.C. Idle following the first COMWAKE signal transmitted during SNW-3.

Possible Problems

The method of SSC employed by the DUT will have to be determined by a lower level
PHY test.