Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 93

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

92

SAS Link and Transport Layer Test Suite v0.13

Test 9.2.1 - SSP Command IU – TAG

Purpose: To determine that the DUT properly sets the TAG field.

References:

9.2.1 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator. SAS Target with 2 LUNs within the same SSP
Target Port. If the DUT is an initiator, it will need to have software capable of generating SCSI traffic.

Revision History: September 23, 2004

Test Setup: The DUT and the Testing Station are physically connected. The SAS Initiator DUT is attached to the
SAS Target through a SAS Protocol analyzer.

Test Procedure (SSP Initiators):

• Allow the DUT to open a connection to the attached SAS Target. Observe commands from the DUT to

each LUN on the target.


Observable Results: If the DUT is an initiator, verify that the TAG field is unique for commands to different LUNs
no the SSP target port.

Advertising