Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 148
Advertising
University of New Hampshire
InterOperability Laboratory
expected to do the same.
11. The Testing Station is the instructed to transmit its Phy Capabilities bits indicating
support for all speeds and SSC settings. The DUT is expected to transmit it's Phy
Capabilities Bits.
Observable Results
Verify that the time between the first COMWAKE signal transmitted in SNW-3 and the
next transmitted dword to be approximately 609.23 µs.
Possible Problems
●
None.
UNH-IOL
SAS 2.0 Speed Negotiation
12 of 49
Advertising