Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 21
The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
20
SAS Link and Transport Layer Test Suite v0.13
Test 7.3.1 - SSP_Frames - Interlocked Frame
Purpose: To determine that the DUT handles interlocked frames properly.
References:
7.16.3, 7.16.5 SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator
Revision History: September 13, 2004
Test Setup: The DUT and the Testing Station are physically connected. This test is only applicable to targets.
Test Procedure (Targets):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is an initiator.
• The Testing Station should open a SSP connection to the DUT and transmit a SCSI_INQUIRY
command.
• Wait for the DUT to transmit ACK followed by SCSI Response.
Observable Results: Verify that upon receiving the INQUIRY command, the DUT transmitted ACK before
transmitting any other frame to the Testing Station.