Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 21

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

20

SAS Link and Transport Layer Test Suite v0.13

Test 7.3.1 - SSP_Frames - Interlocked Frame

Purpose: To determine that the DUT handles interlocked frames properly.

References:

7.16.3, 7.16.5 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator

Revision History: September 13, 2004

Test Setup: The DUT and the Testing Station are physically connected. This test is only applicable to targets.

Test Procedure (Targets):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is an initiator.

• The Testing Station should open a SSP connection to the DUT and transmit a SCSI_INQUIRY

command.

• Wait for the DUT to transmit ACK followed by SCSI Response.


Observable Results: Verify that upon receiving the INQUIRY command, the DUT transmitted ACK before
transmitting any other frame to the Testing Station.

Advertising