SAS Link and Transport Layer Test Suite v0.13

Test 10.1.3 - SCSI CDB – START STOP

Purpose: To determine that the DUT, an SSP Target port, properly handles a START STOP command.

References:

SBC-2 5.19

Resource Requirements: SAS Protocol Analyzer and Generator.

Revision History: February 8, 2005

Test Setup: The DUT and the Testing Station are physically connected.

Test Procedure (SSP Target):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is a SAS Initiator.

• The Testing Station should open an SSP connection to the DUT and transmit a SCSI START STOP

command to the DUT. Close the connection

• Allow the DUT to open an SSP connection and transmit a RESPONSE frame to the received

command.


Observable Results: Verify that the DUT transmits RESPONSE frame indicating that the command completed
with GOOD status.