Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 104

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

103

SAS Link and Transport Layer Test Suite v0.13

Test 7.2.2 - Connections – 2 SOAF Received

Purpose: To determine that the DUT properly handles received 2 SOAF primitives.

References:

7.2.5.11 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator

Revision History: February 15, 2005

Test Setup: The DUT and the Testing Station are physically connected.

Test Procedure (Expanders):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a expander the Testing Station should transmit an Identify Address
frame indicating that it is an SMP Initiator.

• The Testing Station should transmit the following to the DUT

o SOAF primitive
o the first 4 dwords of an SMP OpenAddress frame
o complete SMP Open Address frame starting with SOAF.

• Wait for the DUT to transmit OPEN_ACCEPT and RRDY.


Observable Results:

Verify that the DUT responded to the received, complete Open Address frame with OPEN_ACCEPT.


Advertising