Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 20

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

19

SAS Link and Transport Layer Test Suite v0.13

Test 7.2.7 - Connections - OPEN_REJECT Retry

Purpose: To determine that the DUT handles extra connection requests properly.

References:

7.2.5.11 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator

Revision History: September 13, 2004

Test Setup: The DUT and the Testing Station are physically connected.

Test Procedure (Targets):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is an initiator.

• The Testing Station should continuously transmit OpenAddress frames to the DUT with a correct

destination SAS Address.

• Wait for the DUT to transmit OPEN_REJECT (Retry).


Observable Results: Verify that the DUT responded to the received, complete Open Address frame with
OPEN_REJECT (Retry). This item may not be testable for some devices.


Advertising