Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 22
The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
21
SAS Link and Transport Layer Test Suite v0.13
Test 7.3.2 - SSP_Frames - No ACK for Interlocked Frame
Purpose: To determine that the DUT responds properly when no ACK or NAK is received after transmitting an
interlocked frame.
References:
7.16.3, 7.16.5 SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator
Revision History: January 25, 2005
Test Setup: The DUT and the Testing Station are physically connected. This test is only applicable to targets.
Test Procedure (Targets):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is an initiator.
• The Testing Station should open a SSP connection to the DUT and transmit a SCSI_INQUIRY
command.
• Wait for the DUT to transmit ACK followed by SCSI Response.
• The Testing Station should not transmit ACK or NAK to the SCSI Response frame.
• The Testing Station should transmit a second SCSI_INQUIRY command with a different TAG than
the first SCSI INQUIRY command.
Observable Results: Verify that the DUT aborts the first INQUIRY command with DONE(ACK/NAK TIMEOUT)
after the ACK/NAK timeout of 1 msec.