SAS Link and Transport Layer Test Suite v0.13

Test 7.3.2 - SSP_Frames - No ACK for Interlocked Frame

Purpose: To determine that the DUT responds properly when no ACK or NAK is received after transmitting an
interlocked frame.

References:

7.16.3, 7.16.5 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator

Revision History: January 25, 2005

Test Setup: The DUT and the Testing Station are physically connected. This test is only applicable to targets.

Test Procedure (Targets):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is an initiator.

• The Testing Station should open a SSP connection to the DUT and transmit a SCSI_INQUIRY

command.

• Wait for the DUT to transmit ACK followed by SCSI Response.

• The Testing Station should not transmit ACK or NAK to the SCSI Response frame.

• The Testing Station should transmit a second SCSI_INQUIRY command with a different TAG than

the first SCSI INQUIRY command.


Observable Results: Verify that the DUT aborts the first INQUIRY command with DONE(ACK/NAK TIMEOUT)
after the ACK/NAK timeout of 1 msec.