SAS Link and Transport Layer Test Suite v0.13

Test 10.1.7 - SCSI CDB – WRITE(10)

Purpose: To determine that the DUT, an SSP Target port, properly handles a WRITE(10) command.

References:

SBC-2 5.27

Resource Requirements: SAS Protocol Analyzer and Generator.

Revision History: September 28, 2004

Test Setup: The DUT and the Testing Station are physically connected.

Test Procedure (SSP Target):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is a SAS Initiator.

• The Testing Station should open an SSP connection to the DUT and transmit a SCSI WRITE

command for 2048 bytes. Close the connection

• Allow the DUT to open an SSP connection to the Testing Station and transmit XFER_RDY.

• The Testing Station should open a connection to the DUT and transmit 4 512 byte DATA frames.

Close the connection.

• Allow the DUT to open an SSP connection and transmit a SCSI RESPONSE frame to the received

command and data.


Observable Results: Verify that the DUT transmits RESPONSE frame indicating that the command completed
with GOOD status. Verify that the DUT transmitted ACK for every received DATA frame.