Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 152
Advertising
University of New Hampshire
InterOperability Laboratory
Gbps for one SNTT. If the DUT supports 3.0 Gbps signaling, it is expected to the same.
10. The Testing Station is then instructed to transmit D.C. Idle for one RCDT. The DUT is
expected to do the same.
11. The Testing Station is the instructed to transmit its Phy Capabilities bits indicating
support for all speeds and SSC settings. The DUT is expected to transmit it's Phy
Capabilities Bits.
Observable Results
●
Verify that prior to the transmission of the START bit of the of the phy capabilities bits
in SNW-3, at least 500 µs of D.C. Idle is transmitted.
Possible Problems
●
None.
UNH-IOL
SAS 2.0 Speed Negotiation
16 of 49
Advertising