Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 51

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

50

SAS Link and Transport Layer Test Suite v0.13

Test 9.6.1 - SSP ERROR HANDLING – Invalid Length

Purpose: To determine that the DUT, an SSP Target port properly handles a command received which is too short
to contain a valid CDB.

References:

9.2.5.1 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator.

Revision History: September 27, 2004

Test Setup: The DUT and the Testing Station are physically connected.

Test Procedure (SSP Target):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is a SAS Initiator.

• The Testing Station should open an SSP connection to the DUT and transmit a SCSI INQUIRY

command with a too short CDB. Close the connection

• Allow the DUT to open an SSP connection and transmit a SCSI response frame to the received

command and data.

Observable Results: Verify that if the DUT sets the DATAPRES field to RESPONSE_DATA and the RESPONSE
CODE field to INVALD FRAME.

Advertising