Teledyne LeCroy SAS Verification Test Descriptions User Manual

Page 32

Advertising
background image

The University of New Hampshire

InterOperability Laboratory



Serial Attached SCSI Consortium

31

SAS Link and Transport Layer Test Suite v0.13

Test 7.5.5.1 - BREAK – OpenTimeout Timer SSP Target

Purpose: To determine that the DUT, an SSP target transmits BREAK after the OpenTimeout Timer expires.

References:

7.12.2.1, 7.12.6 SAS Standard

Resource Requirements: SAS Protocol Analyzer and Generator

Revision History: September 13, 2004

Test Setup: The DUT and the Testing Station are physically connected.

Test Procedure (SSP Target):

• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence

with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is an Edge Expander.

• The Testing Station should open an SSP connection to the DUT from another address, imitating a SAS

Initiator.

• Wait for the DUT to transmit OPEN_ACCEPT and RRDY. The Testing Station should transmit a

SCSI INQUIRY command to the DUT, then close the connection.

• Wait for the DUT to open an SSP connection to the Testing Station to the same address that sourced

the SCSI INQUIRY command.

• The Testing Station should wait for the DUT to transmit an OpenAddress frame for an SSP

connection. The Testing Station should not respond to the OpenAddress frame with OPEN_ACCEPT
or OPEN_REJECT.


Observable Results:
Verify that 1msec after transmitting the OpenAddress frame, the DUT transmitted BREAK.


















Advertising