Teledyne LeCroy SAS Verification Test Descriptions User Manual
Page 47
The University of New Hampshire
InterOperability Laboratory
Serial Attached SCSI Consortium
46
SAS Link and Transport Layer Test Suite v0.13
Test 9.5.1 - SSP RESPONSE IU – NO DATA PRESENT
Purpose: To determine that the DUT, an SSP Target port, properly sets the DATAPRES field to NO_DATA if a
command completes without sense data to return.
References:
9.2.2.5.1 SAS Standard
Resource Requirements: SAS Protocol Analyzer and Generator.
Revision History: September 27, 2004
Test Setup: The DUT and the Testing Station are physically connected.
Test Procedure (SSP Target):
• The Testing Station should start and complete a Phy Reset sequence followed by an Identify sequence
with the DUT. Since the DUT is a target the Testing Station should transmit an Identify Address frame
indicating that it is a SAS Initiator.
• The Testing Station should open an SSP connection to the DUT and transmit a SCSI Test Unit Ready
command to the DUT. This should not be the first command received by the DUT since power on.
Close the connection
• Allow the DUT to open an SSP connection to the Testing Station and transmit a SCSI response frame
to the received command.
Observable Results: Verify that if the DUT sets the DATAPRES field to NO_DATA if the command completes
without sense data to return when the command finishes with status GOOD.